Sign In | Join Free | My burrillandco.com
Home > Polyurethane Foam Machine >

PLC Control Polyurethane Foam Machine Sponge PU Foam Making Machine For Pillow

Dongguan Zehui machinery equipment co., ltd
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now
    Buy cheap PLC Control Polyurethane Foam Machine Sponge PU Foam Making Machine For Pillow from wholesalers
     
    Buy cheap PLC Control Polyurethane Foam Machine Sponge PU Foam Making Machine For Pillow from wholesalers
    • Buy cheap PLC Control Polyurethane Foam Machine Sponge PU Foam Making Machine For Pillow from wholesalers
    • Buy cheap PLC Control Polyurethane Foam Machine Sponge PU Foam Making Machine For Pillow from wholesalers

    PLC Control Polyurethane Foam Machine Sponge PU Foam Making Machine For Pillow

    Ask Lasest Price
    Brand Name : ZHMACH
    Model Number : ZHF-2017
    Certification : CE
    Price : inquiry
    Payment Terms : Western Union, L/C, T/T
    Supply Ability : two sets per month
    Delivery Time : 45days after receive downpayment
    • Product Details
    • Company Profile

    PLC Control Polyurethane Foam Machine Sponge PU Foam Making Machine For Pillow


    PLC Control Polyurethane Foam Machine Sponge PU Foam Making Machine For Pillow


    PU sponge foam Continuous Foam Machines is the horizontal foam making machine that make long foam continuously then with one block cutter cut into foam block for make the foam for mattress and sofa.

    The machine is automatic PLC control and can save more than 200 sets of foaming formulations in the computer.
    It adopt the advance technology from UK with import spare

    Main technique parameters and equipments

    (1)The whole machine parts specifications:

    1, Foaming controlling Platform (standard) L3m×W2.52m×H0.7m
    2, Oven declining board (standard) L6.8m×W0.98m~2.3m
    3, Oven side links (standard) L18m×W2.3m×H1.2m
    4, Oven machine frame (standard) L18m ×W4m×H3m
    5, Oven inner conveyer line (standard) L18m×W2.3m×H0.83m
    6, Foam block cutter machine (standard) W2.3m×H1.30m(knife belt with cross type )
    7, R.S. Pulling system with plastic one set


    Main technique specification:

    Oven Length18mInner Conveyer length18m
    Foaming Height1.0-1.25mSide Borar Adjustable Width0.98-2.3m
    Foaming Width1.0-2.25mConveyer Belt Speed0-8m/min
    Foaming Density8-100kg/m3Fall PlateSix section adjustable
    Total Power130KWTotal output100-300kg/min

    DimensionTotal length 35m×Total width 4m×Total Height 3m
    Foaming material Group13 groups, man-machine interface, both manual and automatically computer control
    Foaming width980mm~2250mm
    Foaming heightMax 1200mm
    Foaming density8Kg/m³~100kg/m³
    Foaming speed2000r/min~7000r/min
    Max total output300kg/min
    Material spraying way① The way of down sprayer head (upper, down, front, back can be adjusted) ② the way of trough overflow pipe.
    Controlling way of foaming

    ①PLC controlling, can continuously foaming two different formulas in one time
    ②All inverter controlling foaming and work in phase with the production line
    ③Oven declining board height and width can be adjusted by control box.
    ④Oven side links width can be adjusted by control box

    Mixing –head motor

    37kw

    Total power

    About 90kw

    Pneumatic, flow meter equipments types
    ModelPass CaliberUseQtyBrand
    K-301L/75DA cross valveG2″POP, PPG,CaCO3,Foam3Korea
    K-301L/63DA p cross valveG1″TDI foam1Korea
    K-301L/32DA cross valveG½″Other small material, Flame retardant, Anti-yellow9Korea
    DK800 glass flow meter20-200 L/hAIR1China
    FA10-15 glass flow meter40~400L/HH2O1


    China

    FA10-25F glass flow meter150~1500L/HMC1


    China

    FA10-25F glass flow meter600~6000L/HTDI1
    Transducer speed adjusted headΦ25*2000mmfoam1Zehui


    FAQ:


    Q: How many days for the install and testing of the machine?

    A: After all the machine in your factory we will send 1-2 engineer help to install the machine you must send someone to help about 30 days installation will finished. After that one electrician and one foaming engineer will come to connecting the cable and run the machine in 15days. Total 45days the machine can be running.

    Q: For the cost of the engineer how much I need to pay?

    A: You need to pay USD40 one day for one engineer and also need to pay for the visa fee turn-round ticket fee and food hotel.

    Q:What kind of raw material tools we need to prepare for the testing?

    A: We will send you a list for the tools that you need to prepare for testing and also can help to buy if you required.

    Q: After the machine testing if we need some engineer to stay in our factory can you help to find?

    A: Sure we can help to hire one experience engineer to work in your factory but you need to discuss the salary and all details with him.

    Q:During the foaming if we have some problems abt the foam and the machine how can we do ?

    A: You can just call our after sale manager explain for the situation or send some picture we will help to handle within 24hours.

    The main part of the machine




    INSTRUCTION OF CONTINUOUS FAOMING MACHINE LINE.pdf...

    Quality PLC Control Polyurethane Foam Machine Sponge PU Foam Making Machine For Pillow for sale
    Inquiry Cart 0
    Send your message to this supplier
     
    *From:
    *To: Dongguan Zehui machinery equipment co., ltd
    *Subject:
    *Message:
    Characters Remaining: (0/3000)